Coastal instability and cross-shore sediment movement: Management in the face of sea level rise (Phase Three)

The summary for the Coastal instability and cross-shore sediment movement: Management in the face of sea level rise (Phase Three) grant is detailed below. This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact. If any section is incomplete, please visit the website for the National Park Service, which is the U.S. government agency offering this grant.
Coastal instability and cross-shore sediment movement: Management in the face of sea level rise (Phase Three): This is NOT a request for applications. This is just an announcement that NPS is continuing its agreement with PCCS for Phase 3 of their work on coastal instability and cross-shore sediment movement: Management in the face of sea level rise. Specifically, the cooperator will: The Cooperator will: 1. Data Acquisition and Formatting A. Acquire source data 1) Maj. J.D. Graham [1830’s]. 2) Henry L. Marindin / H-sheet [1880’s]. 3) USC&GS bathymetric surveys [1930’s]. 4) USACE (and other) lidar, PCCS bathymetry [2000’s]. B. Convert source data to standard format. 1) Georectify 1833 charts. 2) Convert all horizontal and vertical datums to NAD83(v2011, epoch 2010) (hor.) and NAVD88 (vert.). 3) Digitize numerical data from historical charts and surveys (above). 4) Plot final topography, bathymetry and shorelines for all four time periods. 5) Estimate positional accuracy based on historical benchmarks and contemporary tidal records. 2. Data processing and Analysis A. Overlay topography, bathymetry and shorelines; measure change and produce summary tables and figures. B. Derive and plot cross-shore transects. C. Overlay transects and measure volumetric change rates (vol/unit longshore dist/yr) for each time period represented by data sources. 3. Data Interpretation and Verification A. Estimate longshore and cross-shore transport rates by time period. B. Field observations. (1) Establish cross-shore observation line. (2) Estimate tidal currents from drogue deployments. (3) Observe bedforms and sample seafloor sediment. (4) Analyze sediment for size and sorting characteristics. IV. Report Preparation
Federal Grant Title: Coastal instability and cross-shore sediment movement: Management in the face of sea level rise (Phase Three)
Federal Agency Name: National Park Service
Grant Categories: Other
Type of Opportunity: Discretionary
Funding Opportunity Number: NPS-13-NERO-0146
Type of Funding: Cooperative Agreement
CFDA Numbers: 15.945
CFDA Descriptions: Cooperative Research and Training Programs - Resources of the National Park System
Current Application Deadline: Sep 13, 2013 This is NOT a request for applicatio
Original Application Deadline: Sep 13, 2013 This is NOT a request for applicatio
Posted Date: Sep 9, 2013
Creation Date: Sep 9, 2013
Archive Date: Sep 14, 2013
Total Program Funding: $80,000
Maximum Federal Grant Award: $80,000
Minimum Federal Grant Award: $80,000
Expected Number of Awards: 1
Cost Sharing or Matching: No
Category Explanation
This is NOT a request for applications. This is just an announcement that NPS is continuing its agreement with PCCS for Phase 3 of their work on coastal instability and cross-shore sediment movement: Management in the face of sea level rise.
Applicants Eligible for this Grant
Nonprofits having a 501(c)(3) status with the IRS, other than institutions of higher education
Additional Information on Eligibility
This is NOT a request for applications. This is just an announcement that NPS is continuing its agreement with PCCS for Phase 3 of their work on coastal instability and cross-shore sediment movement: Management in the face of sea level rise.
Grant Announcement Contact
Keith Zotti Partnership Program Specialist Phone 2155979153
PCCS Phase 3

National Park Service 303-898-9819
Similar Government Grants
GP CESU: Conduct Visitor Use Study at Tallgrass Prairie National Preserve
GRRI CESU:Pilot Algal Assessment and Invasive Algae Detection at OZAR
Aquatic Invasive Species Prevention
Monitoring, inventory, public outreach, and trace fossil research
Grand Ditch Restoration Adaptive Management Monitoring
Historic Structure Analysis of Bowman-Hite House and Bank Barn, Cedar Creek and Belle Grov...
National Park Service- Catalog Southwest Regional Office Central Files
National Park Service- Archeological Testing at LA162528/PECO742, Pigeon's Ranch Subunit, ...
More Grants from the National Park Service
Greenstone Trail and Campground Rehabilitation - ISRO
GP CESU: Conduct Visitor Use Study at Tallgrass Prairie National Preserve
GRRI CESU:Pilot Algal Assessment and Invasive Algae Detection at OZAR
Conservation Crew for Prairie Restoration - THRO
Rehabilitation of Greenstone Ridge Trail and Campground - ISRO

FederalGrants.com is not endorsed by, or affiliated with, any government agency. Copyright ©2019 FederalGrants.com