Construction of Clearwater Coho Acclimation Pond |
The summary for the Construction of Clearwater Coho Acclimation Pond Federal Grant is detailed below. It contains information such as the Catalog of Federal Domestic Assistance (CFDA) number, who is eligible for the grant, how much grant money will be awarded, important deadlines, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed in the Grant Announcement Contact section. If these sections are incomplete, please visit the website of the government agency that is offering this grant.
-
Federal Grant Title: Construction of Clearwater Coho Acclimation Pond CFDA Number: Information not provided CFDA Description: Information not provided Federal Agency Name: Other Agency Category of Funding Activity: Other Category Explanation: This project will modify an existing hatchery acclimation facility to allow Mitchell Act coho salmon smolts to be acclimated prior to release. This will increase juvenile survival, increase adult returns, increase our opportunity to collect broodstock for a local broodstock source and minimize impacts to non-target populations (ESA listed fall Chinook and steelhead) Opportunity Category: Earmark Funding Opportunity Number: 10140-AG100 Document Type: Grants Notice Funding Instrument Type: Grant Posted Date: Jun 09, 2010 Creation Date: Jun 09, 2010 Original Closing Date for Applications: Jun 17, 2010 Current Closing Date for Applications: Jun 17, 2010 Archive Date: Jul 17, 2010 Expected Number of Awards: Information not provided Estimated Total Program Funding: Information not provided Federal Grant Award Ceiling: $201,661 Federal Grant Award Floor: Information not provided Cost Sharing or Matching Requirement: No
- Applicants Eligible for this Grant
- Native American tribal governments (Federally recognized)
- Additional Information on Eligibility
- Information not provided
- Grant Description
- The proposed pond modifications would occur at the existing Nez Perce Tribal Hatchery facility known as the North Lapwai Valley (NLV) acclimation site. NLV is operated by the NPT with funding from Bonneville Power Administration, and is located approximately 0.75 miles upstream of the confluence of Lapwai Creek and the Clearwater River in Nez Perce County, Idaho. The NLV is currently used to acclimate fall Chinook salmon subyearling smolts, which precludes the use of existing facilities for the acclimation of coho salmon. The NLV satellite currently has two ponds, with approximately 13,150 cfs of rearing space each, with both a surface and groundwater supply system that can be mixed to control water temperature. The ponds are located in the higher elevation area of the site with discharge entering Lapwai Creek near the State Highway Route 95 bridge crossing. The site was designed for additional pond construction and has adequate living quarters for personnel to occupy during acclimation. The following modifications are proposed at this site: - Excavate a pond to acclimate up to 550,000 coho salmon down slope from the existing ponds. The proposed pond would be 23,000 cubic feet, allowing the acclimation of 550,000 coho smolts at a density index (Piper et al. 1982) of 0.3. - Tap into the existing pond overflow, well, and surface water head tank. - Construct a first pass water supply through the overflow of the existing head tank, and allow for diversion of second pass water through the overflow from existing ponds. - Construct small check dams to impound a series of small pools along the existing overflow ditch leading to Lapwai Creek.
- Link to Full Grant Announcement
- Information not provided
- Grant Announcement Contact
- Rich Johnson Project Manager (503) 231-6835
work [rich_r_johnson@fws.gov]
