Opportunity DE-FOA-0000112

The summary for the Opportunity DE-FOA-0000112 Federal Grant is detailed below. It contains information such as the Catalog of Federal Domestic Assistance (CFDA) number, who is eligible for the grant, how much grant money will be awarded, important deadlines, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed in the Grant Announcement Contact section. If these sections are incomplete, please visit the website of the government agency that is offering this grant.


Federal Grant Title: Opportunity DE-FOA-0000112
CFDA Number: 81.087
CFDA Description: Renewable Energy Research and Development
Federal Agency Name: Golden Field Office
Category of Funding Activity: Energy
Category Explanation: Information not provided
Opportunity Category: Discretionary
Funding Opportunity Number: DE-FOA-0000112
Document Type: Modification to Previous Grants Notice
Funding Instrument Type: Grant
Posted Date: Jun 23, 2009
Creation Date: Aug 12, 2009
Original Closing Date for Applications: Aug 13, 2009 to meet program requirements
Current Closing Date for Applications: Aug 25, 2009 To meet program requirements
Archive Date: Oct 23, 2009
Expected Number of Awards: Information not provided
Estimated Total Program Funding: Information not provided
Federal Grant Award Ceiling: $45,000,000
Federal Grant Award Floor: $0
Cost Sharing or Matching Requirement: Yes

Applicants Eligible for this Grant
State governments - County governments - City or township governments - Special district governments - Public and State controlled institutions of higher education - Private institutions of higher education - Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled "Additional Information on Eligibility"
Additional Information on Eligibility
Information not provided
Grant Description
This Funding Opportunity Announcement is for the design and construction of a large dynamometer facility for testing 5 to 15 MW rated drivetrains, with supporting systems, and the operation and maintenance of these facilities for the benefit of wind stakeholders nationwide. The proposed facility can be new construction or involve the design and modification of an existing building suitable for electrical, mechanical, and other physical needs associated with a dynamometer test stand. Overhead cranes, access doors, and other facility infrastructure suitable for accommodating associated components and equipment will be required. It is envisioned that the facility will include sufficient office space for permanent staff and visiting users as well as conference rooms, lunch room, restrooms, computer stations, etc. Applicants will be required to submit detailed multi-phase plans including concept designs, preliminary designs, engineering procurement and construction contract management, and operation and maintenance. DOE envisions awarding a single $45 Million financial assistance grant award on a competitive basis. This $45 million program is to assist in the design and construction of an accredited dynamometer testing facility capable of performing Highly Accelerated Life Testing (HALT) of 5 to 15MW rated wind turbine drive trains and generators, including all required supporting systems. As HALT is assumed to require at least a 30% overload in the rated torque of the test article, the dynamometer facility will require a minimum capacity of 20MW to support testing of a 15MW rated drivetrain. The facility should incorporate features to accommodate large direct drive generators in addition to generator/gearbox drivetrain configurations. In addition, the capability to simultaneously impart dynamic and/or steady off-axis loads (bending, radial and axial loads) to the low speed shaft of the test article will be required. It is anticipated that the facility will incorporate multiple test bays, permitting simultaneous, independent testing of two 7.5MW rated drivetrains. It is expected that the test bay dynamometers would be coupled to obtain a single test capability of up to 15MW rated drivetrains. The facility should incorporate the necessary electrical infrastructure to permit interconnection of the test article at all common system operating voltages. The facility should also be capable of testing generator system response to grid anomalies and for grid code compliance. Independent accreditation of the facility to conduct certification testing in accordance with applicable wind turbine design standards will be required.
Link to Full Grant Announcement
https://www.fedconnect.net/fedconnect/
Grant Announcement Contact
using thislinksupport@fedconnect.netSara Wilsonsara.wilson@go.doe.gov
If you have any problems linking to the funding opportunity please contact the FedConnect HelpDesk [support@fedconnect.net]
Similar Government Grants
Geothermal Technology Advancement for Rapid Development of Resources in the U.S.
RFI: SunShot Initiative: Solar High Penetration
Request for Information (RFI) Fuel Cell Transit Bus Targets
Notice of Intent: Geothermal Technology Advancement for Rapid Development of Resources in the U.S.
FOA: Biomass Research and Development Initiative
Component Development for Distributed Wind Technologies (DWT)
Concept Studies for Distributed Wind Technologies (DWT)
USDA, NRCS Biomass Research and Development Initiative
LED High-efficiency semiconductor materials
LED Device approaches, structures and systems

FederalGrants.com is not endorsed by, or affiliated with, any government agency. Copyright ©2012 FederalGrants.com