New England Transportation Consortium Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets
The summary for the New England Transportation Consortium Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets grant is detailed below.
This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants.
Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact.
If any section is incomplete, please visit the website for the DOT Federal Highway Administration, which is the U.S. government agency offering this grant.
New England Transportation Consortium Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets: The Government hereby requests an application from the University of Maine for assistance to result in a Cooperative Agreement with the Federal Highway Administration (FHWA) for completion of the New England Transportation Consortium (NETC) Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets. The objective of the study is to develop a method to estimate the portion of the other resisting force not recognized by AASHTO for New England rock conditions.
Federal Grant Title: | New England Transportation Consortium Research Study 05-1: Develop Base Resistance Load Displacement Curves for the Design of Drilled Shaft Rock Sockets |
Federal Agency Name: | DOT Federal Highway Administration |
Grant Categories: | Transportation |
Type of Opportunity: | Discretionary |
Funding Opportunity Number: | DTFH61-09-RA-00011 |
Type of Funding: | Cooperative Agreement |
CFDA Numbers: | 20.200 |
CFDA Descriptions: | Highway Research and Development Program |
Current Application Deadline: | Sep 08, 2009 |
Original Application Deadline: | Sep 08, 2009 |
Posted Date: | Aug 26, 2009 |
Creation Date: | Aug 26, 2009 |
Archive Date: | Oct 08, 2009 |
Total Program Funding: | $47,755 |
Maximum Federal Grant Award: | $47,755 |
Minimum Federal Grant Award: | $0 |
Expected Number of Awards: | 1 |
Cost Sharing or Matching: | No |
- Applicants Eligible for this Grant
- Others (see text field entitled "Additional Information on Eligibility" for clarification)
- Additional Information on Eligibility
- University of Maine
- Grant Announcement Contact
- Samantha Reizes Agreement Officer Phone 202-366-4224
[email protected] [[email protected]] - Similar Government Grants
- • FY23-FY24 Advanced Transportation Technology and Innovation (ATTAIN) Program
- • Saving Lives with Connectivity: Accelerating Vehicle to Everything (V2X) Deployment
- • 2023-2026 Accelerated Innovation Deployment (AID) Demonstration
- • Fiscal Year (FY) 2022-2026 Advanced Digital Construction Management Systems (ADCMS)
- • Advancing Sustainability And Resilience In Pavements
- • Low Cost Carbon Fiber Production Technology
- • National Safe Routes to School Clearinghouse
- • National Bicycle and Pedestrian Clearinghouse
- More Grants from the DOT Federal Highway Administration
- • Guardrail Safety Training
- • Fiscal Years 2022, 2023, and 2024 Prioritization Process Pilot Program
- • FY22-FY24 Congestion Relief Program
- • Dwight David Eisenhower Transportation Fellowship Program (DDETFP) Graduate Fellowship
- • Administration of the Dwight David Eisenhower Transportation Fellowship Program (DDETFP) L...