Design, Construction and Construction Oversight for Reaches 24.1, 25 and 26 of the Navajo Gallup Waer Supply System

The summary for the Design, Construction and Construction Oversight for Reaches 24.1, 25 and 26 of the Navajo Gallup Waer Supply System grant is detailed below. This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact. If any section is incomplete, please visit the website for the Bureau of Reclamation Upper Colorado Region, which is the U.S. government agency offering this grant.
Design, Construction and Construction Oversight for Reaches 24.1, 25 and 26 of the Navajo Gallup Waer Supply System: The Navajo Nation and Reclamation have determined the most effective means for accomplishing the construction of Reach 24.1, Reach 25 and Reach 26 would be for Reclamation to provide the funds necessary in order for the Navajo Nation to construct, provide the planning, designs, plans, specifications, environmental compliance, cultural resource compliance, acquisition of land, acquisition of easements, rights of way and all necessary permits, engineering review, contract(s), contract administration, construction and construction oversight for the transmission of water through Reach 24.1, Reach 25 and Reach 26 extending at or near the existing Counselor Central Tank and ending near the existing Ojo Encino and Torreon distribution systems. All lands and interests in land already owned by the Navajo Nation will be provided by the Navajo Nation at no charge to the government in accordance with Section 10602 (c) of PL 111-11. Upon completion of Reach 24.1, Reach 25 and Reach 26, the Navajo Nation will retain ownership and be responsible for the operation, maintenance, and replacement of those portions of the Project.
Federal Grant Title: Design, Construction and Construction Oversight for Reaches 24.1, 25 and 26 of the Navajo Gallup Waer Supply System
Federal Agency Name: Bureau of Reclamation Upper Colorado Region
Grant Categories: Environment
Type of Opportunity: Discretionary
Funding Opportunity Number: R12SS40041
Type of Funding: Cooperative Agreement
CFDA Numbers: 15.552
CFDA Descriptions: NAVAJO-GALLUP WATER SUPPLY PROJECT
Current Application Deadline: Aug 31, 2012
Original Application Deadline: Aug 31, 2012
Posted Date: Aug 17, 2012
Creation Date: Aug 17, 2012
Archive Date: Sep 01, 2012
Total Program Funding: $43,000,000
Maximum Federal Grant Award: $43,000,000
Minimum Federal Grant Award: $0
Expected Number of Awards: 1
Cost Sharing or Matching: No
Applicants Eligible for this Grant
City or township governments - Native American tribal governments (Federally recognized) - Nonprofits having a 501(c)(3) status with the IRS, other than institutions of higher education - For profit organizations other than small businesses
Grant Announcement Contact
Lila Duffin Grant Specialist Phone 801-524-3647

Bureau of Reclamation [[email protected]]
Similar Government Grants
Design, Construction and Construction Oversight for the Reaches 24.1, 25 and 26 of the Nav...
More Grants from the Bureau of Reclamation Upper Colorado Region
Hopi Participation in the Long-Term Experimental and Management Plan for the Glen Canyon D...
Long Term Experimental and Management Plan (LTEMP) Environmental Impact Statement (EIS) Pa...
Analysis of Potential San Juan Ecosystem Restoration Sites and Hazardous Material Threats
Paiute Participation in the Long-Term Experimental and Management Plan for the Glen Canyon...
Design, Construction and Construction Oversight for the Reaches 24.1, 25 and 26 of the Nav...

FederalGrants.com is not endorsed by, or affiliated with, any government agency. Copyright ©2007-2024 FederalGrants.com