Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation

The summary for the Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation grant is detailed below. This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact. If any section is incomplete, please visit the website for the Bureau of Reclamation, which is the U.S. government agency offering this grant.
Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation: Lewiston Orchards Irrigation District (District) is a special government district formed to operate and maintain Reclamation irrigation facilities and distribute natural flow and stored water from Reclamation reservoirs to Lewiston Orchards Project (LOP) lands located in Lewiston, Idaho. The District's water supply comes from the Craig Mountain watershed. Water is collected during the periods of rain and snow runoff at the three Federally-owned reservoirs operated by the District: The Sweetwater Canal is the primary distribution canal. Water for irrigation is diverted from Sweetwater Creek into this canal and then gravity fed to Reservoir A. Due to threatened steelhead populations covered under the Environmental Species Act (ESA), the District has been greatly restricted on the volume of water it is allowed to divert. The current irrigation system distributes water from the three reservoirs to approximately 3,850 acres within the District's boundaries, representing 6,240 separate user accounts. Climate changes have created water shortages on and off within the District's system for the last several years. Also, Reclamation has committed certain stream flows from the Craig Mountain watershed within the Lapawi Basin for the recovery of threatened steelhead populations covered under the ESA. The dwindling water supply is making it very difficult for the District to supply water to its patrons. Past efforts for monitoring of water consumption proved inefficient and often ineffective, and now the District is now trying to balance the water user needs with the emerging needs for water for tribal and environmental uses. In 2005 the District adopted a Water Conservation Plan (plan) that addresses the need for meter irrigation services at each delivery point. The District has actively sought financial assistance from Reclamation to assist in the metering endeavor; by the end of 2015, the District will be approximately 68% metered. In 2013, the District received financial assistance from Reclamation to complete design and construction activities for a pilot groundwater well project to investigate the practicality of the well as a field alternative water supply. Although the hydrology report from the test well has not yet been received, the water supply appears to be promising, so the District is currently being evaluated for more wells, starting with Well #6. To partially resolve impacts in the Lapawi Basin to endangered steelhead and their habitat caused by surface withdrawals of irrigation water, the District has requested financial assistance to complete the engineering design for another proposed groundwater well, Well #6, and to install approximately 2080 irrigation meters at points of water delivery within the distribution system. Additional meters will make the District's system more efficient and effective. Both of these activities will ultimately create a more stable water supply and allow more surface water from the Craig Mountain watershed to remain in the streams in the Lapawi Basin for threatened steelhead populations covered under the ESA. RECIPIENT INVOLVEMENT The purpose of this project is to design and construct well #6 and to construct a power station needed to operate the wellfield. Ideally, the second well will be located in close proximity to the pilot well. With this Financial Assistance the District will: •Purchase land and easement sufficient for access and use of the well site and power substation. •Perform all site preparation work necessary for site access and improvements. •Design and construct a power substation necessary to provide ample power to operate the finished wellfield. •Design and construct one well, wellhouse, pump, and piping sufficient to convey groundwater from the deep Lewiston basin aquifer to the existing irrigation distribution system. •Secure all permits necessary to perform the work, including but not limited to, a water right permit, building permit, and conditional use permit or equivalent. •Solicit bids from contractors, negotiate contracts with contractors, and oversee construction of project. •Administer grants, pay contractors, and invoice project supporters. •Work with federal and state agencies to monitor effectiveness of project
Federal Grant Title: Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation
Federal Agency Name: Bureau of Reclamation (DOI-BOR)
Grant Categories: Natural Resources
Type of Opportunity: Continuation
Funding Opportunity Number: BOR-PN-17-N010
Type of Funding: Grant
CFDA Numbers: 15.517
CFDA Descriptions: Information not provided
Current Application Deadline: August 31st, 2017
Original Application Deadline: August 31st, 2017
Posted Date: August 17th, 2017
Creation Date: August 17th, 2017
Archive Date: September 30th, 2017
Total Program Funding: $8,999,023
Maximum Federal Grant Award: $8,999,023
Minimum Federal Grant Award: $1
Expected Number of Awards:
Cost Sharing or Matching: No
Last Updated: August 17th, 2017
Applicants Eligible for this Grant
Special district governments
Grant Announcement Contact
Randall Filbert
Grants Management Spec
Phone 208-378-5241
[email protected]
Similar Government Grants
Fish and Wildlife Coordination Act Program Financial Assistance for Fiscal Year 2024
Fish and Wildlife Coordination Act Program Fiscal Year 2023
Fish and Wildlife Coordination Act Program Fiscal Year 2022
Notice of Intent to Award to Arizona Game and Fish Dept.
Klamath River Coho Restoration Grant Program (Program) Administration
Habitat Restoration, Improvement and Planning Program in South-Central California Area Off...
Modeling and Monitoring of Water Quality for the williamson river Delta Restoration Projec...
Sulphur Creek Fish Barrier
More Grants from the Bureau of Reclamation
WaterSMART Environmental Water Resources Projects 2024
Fish and Wildlife Coordination Act Program Financial Assistance for Fiscal Year 2024
Water Conservation Field Services Program for Fiscal Year 2024
Snow Water Supply Forecasting Program FY 2024
WaterSMART Aquatic Ecosystem Restoration Projects for Fiscal Year 2023 and 2024

FederalGrants.com is not endorsed by, or affiliated with, any government agency. Copyright ©2007-2024 FederalGrants.com