Matagorda Ship Channel Improvement Project-Environmental Natural Resource Technical Support

The summary for the Matagorda Ship Channel Improvement Project-Environmental Natural Resource Technical Support grant is detailed below. This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants. Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact. If any section is incomplete, please visit the website for the Fort Worth District, which is the U.S. government agency offering this grant.
Matagorda Ship Channel Improvement Project-Environmental Natural Resource Technical Support: Project Title: Oyster surveys for the pre-construction engineering and design phase of the Matagorda Ship Channel Improvement Project, Port Lavaca, Texas. Responses to this Request for Statements of Interest (RSOI) will be used to identify potential investigators for a project to be funded by the U.S. Army Corps of Engineers (USACE), Galveston District which provides professional and technical support for the environmental compliance requirements for the USACE Galveston District Civil Works Missions. Approximately $917,000.00 is expected to be available to support this project, depending on availability of funds. Background: The Matagorda Ship Channel Improvement Project, was authorized in the Water Resources Development Act of 2020. The Final Environmental Impact Statement (2019) for the project requires preconstruction oyster surveys of the project area to finalize the mitigation requirements and the identification of mitigation locations(s) with suitable conditions and available surface area to offset the unavoidable impacts to oysters that would result from the project. Brief Description of Anticipated Work: The primary objective of this project is to collect and provide information needed to finalize the mitigation plan for the project. Information is needed to quantify the project impacts and assess the suitability of mitigation locations for oyster reef propagation. The survey activities follow the protocols used by the Texas Parks and Wildlife Department and include the use of electronic equipment and bottom grabs/cores to characterize substrate composition followed by verification of hard bottom targets using divers or hydraulic patent tongs. a. The surveys should collect all position data with a minimum requirement of using higher level DGPS technologies or RTK GPS that provide sub-meter accuracy. i. Side scan sonar: Data should be collected using a high-resolution side scan sonar system (single or dual frequency 255/400/900 KHz) to identify or detect hard bottom habitat. Side scan sonar results should be ground truthed using grab samples. ii. Sub-bottom profiler: Sub-bottom profiler data should also be collected to determine substrate strata type down to a depth of 25 feet. Sub-bottom profiles should be tied to DGPS positional information and analyzed to determine start and stop of soft sediments and surface shell alongside scan survey transects. iii. Bathymetric survey: A bathymetric survey should be conducted of the entire project area footprint including the 500-foot radius of the project area. b. Hard Bottom Verification: i. Hard bottom targets should be verified by collecting one-quarter meter square quadrats per acre of hard bottom identified, with each quadrat sample spaced a minimum distance of 150 feet apart. ii. Each quadrat verification sample should be collected manually by divers (preferred) or by hydraulic patent tongs comparable to 0.25 square meter sample size. iii. All live and dead oyster shell brought to the surface must be enumerated, lengths measured (in 5 mm increments) and recorded in final report using following categories (# Spat (0-1.5 inches = 0-40 mm), # Submarket/Juvenile (1.5-2.9 inches = 41-75 mm), # Market (3.0+ inches = 76+ mm). Both Live and Dead shell must be categorized. iv. The number of live and dead oysters per acre of each hard bottom target within the project area and within the 500-foot buffer around workspaces should be determined to provide an estimate of number of acres of all viable oyster habitat impacted or avoided in final report. c. Use of survey data to quantify project impacts to oyster reef and to employ ecological modeling strategies to identify potential mitigation areas conducive to oyster reef propagation. d. Report and Documentation i. A report with procedures, field data, with a results section summarizing the project impacts and characterization of the suitable mitigation sites. ii. Geo-referenced, maps of data collected overlayed with the project footprints. iii. Coordinates of all hard bottom targets' positions referenced in tabular form with GPS coordinates (Decimal Degrees in North American Datum 1983). iv. ESRI-compatible (ArcView 9.0+) shape files of bottom types identified in the survey area v. Bathymetry figures and ESRI-compatible (ArcView 9.0+) shape file bottom contours e. The selected PI may be requested to attend 2 to 3, one hour long resource agency meetings which may be attended virtually. Note: At this time, we are only requesting that you demonstrate available qualifications and skills for performing similar or same type of work. You will be evaluated for request for a proposal based on skills, qualifications and certifications demonstrated in your SOI. Preference will be given to statements of interest that demonstrate field technicians that have at least five years of experience conducting oyster surveys, conducting substrate characterization, and evaluating oyster reef restoration projects on the gulf coast, as well as a principal investigator that has the ability to synthesize collected field data into a cohesive report, including methods, results, statistical analysis, and management recommendations. Also, preference will be given to statements of interest that propose the use of divers over hydraulic patent tongs for oyster reef verification. Period of Performance. The base period of performance is anticipated to be twelve (12) months from date of award with no option periods. Note: A full study proposal and proposed budget are NOT requested at this time. Please send responses or direct questions to: Sandy K. Justman Contract Specialist, Fort Worth District Directorate of Contracting U.S. Army Corps of Engineers Phone: 817-886-1073 Email: [email protected] Greg Bonnell Regional Planning and Environmental Center (RPEC) Cell. (918) 951-0591 [email protected] Timeline for Review of Statements of Interest: RSOI will be posted on www.Grants.gov for 15 days, prior to the Government making a decision and requesting full proposals. Responses due by 5:00 P.M., Central Time, on 5 NOV 2021.
Federal Grant Title: Matagorda Ship Channel Improvement Project-Environmental Natural Resource Technical Support
Federal Agency Name: Fort Worth District (DOD-COE-FW)
Grant Categories: Science and Technology
Type of Opportunity: Other
Funding Opportunity Number: W9126G-22-2-SOI-6092
Type of Funding: Cooperative Agreement
CFDA Numbers: 12.010
CFDA Descriptions: Information not provided
Current Application Deadline: November 5th, 2021
Original Application Deadline: November 5th, 2021
Posted Date: October 21st, 2021
Creation Date: October 21st, 2021
Archive Date: December 5th, 2021
Total Program Funding:
Maximum Federal Grant Award: $917,000
Minimum Federal Grant Award: $917,000
Expected Number of Awards: 1
Cost Sharing or Matching: No
Last Updated: October 21st, 2021
Applicants Eligible for this Grant
Unrestricted (i.e., open to any type of entity below), subject to any clarification in text field entitled "Additional Information on Eligibility"
Additional Information on Eligibility
ELIGIBILITY: This funding opportunity is ONLY available for CESU Studies Units under the Gulf Coast Unit, South Florida-Caribbean Unit, Piedmont-South Atlantic Coast.
Grant Announcement Contact
Sandra K Justman
Grantor
Phone 8178861073
[email protected]
Similar Government Grants
• Dworshak Natural Resource Training and Education
• Mill Creek Natural Resource Training and Education
• Natural Resource Management - Lane County Youth Services
• Natural Resource Management (NRM) Education and Training of Eugene, OR, Area Youth
• Willamette Valley Project (WVP) 2026 NRM Education and Training of Botanically Sophisticat...
• Youth Conservation Services
• Natural Resources Training and Education at Mill Creek
• Diamondback Terrapin Monitoring
More Grants from the Fort Worth District
• Aquatic Fauna Response to Ecosystem Restoration in Southwest Florida
• Juvenile Sportfish Community and Habitat Suitability in Florida Bay
• Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial ...
• American Alligators as Ecological Indicators of Everglades Restoration
• Wading Bird Response to Ecosystem Restoration in Southwest Florida

FederalGrants.com is not endorsed by, or affiliated with, any government agency. Copyright ©2007-2026 FederalGrants.com