Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project
The summary for the Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project grant is detailed below.
This summary states who is eligible for the grant, how much grant money will be awarded, current and past deadlines, Catalog of Federal Domestic Assistance (CFDA) numbers, and a sampling of similar government grants.
Verify the accuracy of the data FederalGrants.com provides by visiting the webpage noted in the Link to Full Announcement section or by contacting the appropriate person listed as the Grant Announcement Contact.
If any section is incomplete, please visit the website for the Dept of the Army Corps of Engineers, which is the U.S. government agency offering this grant.
Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project: As part of the SHEP, the U.S. Army Corps of Engineers (USACE) prepared a Monitoring and Adaptive Management Plan (MAMP) that outlines numerous projects and processes that will be carried out to assess project-induced impacts on the environment. One project, or component of the MAMP, included creating a baseline data bank. This data collection, integration, and analysis was initiated in September 2013 and drew upon prior research, readily available data, and new research in the Savannah River Basin and Estuary, located in Georgia and South Carolina, to develop and implement a web-based geographic information system (GIS), which is accessible to the public (http://www.shep.uga.edu/#&panel1-1). This information includes data on the resources of concern such as water quality, fisheries, groundwater, wetlands, etc. Monitoring data and the data integration/analysis conducted as part of the work will be used to evaluate the physical, chemical and biological impacts of the SHEP as discussed in the MAMP. Data will be used to assess the effectiveness of the mitigation features that will be constructed as part of the SHEP to ensure the levels of environmental effects predicted in the Environmental Impact Statement are not exceeded. A. Program Description/Objective: (brief description of the anticipated work) To evaluate the effectiveness of the mitigation features constructed for the SHEP, data must be collected to establish a baseline databank. In addition to the data that will be generated from various pre-construction monitoring studies, existing data on resources in Savannah Harbor must be collected. A literature search would be conducted to identify previous applicable surveys and projects. In addition to locating existing data, resources such as, but not limited to, USACE published reports and surveys that would contain data useful in establishing the SHEP post-construction impacts will be reviewed. Data for resources of concern such as water quality, fisheries, groundwater, wetlands, etc. would be collected. The data will be combined with SHEP monitoring data and integrated into an existing online GIS and web portal.
| Federal Grant Title: | Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project |
| Federal Agency Name: | Dept of the Army Corps of Engineers (DOD-COE) |
| Grant Categories: | Science and Technology |
| Type of Opportunity: | Discretionary |
| Funding Opportunity Number: | W81EWF-23-SOI-0006 |
| Type of Funding: | Cooperative Agreement |
| CFDA Numbers: | 12.630 |
| CFDA Descriptions: | Information not provided |
| Current Application Deadline: | May 22nd, 2023 |
| Original Application Deadline: | May 22nd, 2023 |
| Posted Date: | March 23rd, 2023 |
| Creation Date: | March 23rd, 2023 |
| Archive Date: | June 21st, 2023 |
| Total Program Funding: | $801,680 |
| Maximum Federal Grant Award: | $151,000 |
| Minimum Federal Grant Award: | $0 |
| Expected Number of Awards: | 1 |
| Cost Sharing or Matching: | No |
| Last Updated: | March 23rd, 2023 |
- Applicants Eligible for this Grant
- Others (see text field entitled "Additional Information on Eligibility" for clarification.)
- Additional Information on Eligibility
- This opportunity is restricted to non-federal partners of the Piedmont-South Atlantic Coast Cooperative Ecosystems Studies Unit (CESU).
- Grant Announcement Contact
- Chelsea M Whitten
Grants Officer
Phone 601-634-4679
Grants Officer - Similar Government Grants
- • Research and Education Program for Historically Black Colleges and Universities (HBCU) and...
- • Center for Foundational Academic Research and Strategic Innovation for the Defense Enterpr...
- • Research and Education Program for Historically Black Colleges and Universities (HBCU) and...
- • Willow Creek Reservoir Water Quality Research and Evaluation Studies
- • Improving Lake Superior outflow regulation and quantifying uncertainty
- • FY 06 Department of Defense (DoD) Infrastructure Support Program for Historically Black Co...
- • 2006 Pathogen and Toxin Concentration Systems for Water Monitoring Broad Agency Announceme...
- • FY04 Postdoctoral Research Fellowship Program
- More Grants from the Dept of the Army Corps of Engineers
- • Automated Organization and Analysis of Hydrologic and Infrastructure Data
- • Disrupting and Managing Riverine and other Large-Scale Freshwater Harmful Algal Blooms
- • Risk Analysis of Biotechnology for the Protection of Environmental Resources
- • Technical Support for Watershed Management and Resilience Plan for Fort Leonard Wood, MO
- • Monitoring Potential Cadmium Levels in Avian Tissues Associated with the Savannah Harbor E...
